Hi. Just wondering.
Since it possible to chose between the amount of log on truck and the trailer on loading area.
For instance. 4 p on truck and 2 on trailer. And want to unload the trailer first on one mill and the truck on the second mill.
I know I can detach the trailer before I enter the mill. But then I have to drag the trailer to the next mill.
It would have been more practical to be able to just chose to unload the trailer at the mill, and then leave the trailer behind, and don't have to use more fuel then necessary.
And it would have been more realistic.