Hi,
When I first saw the logging missions, I was eager to get on it...
But I fell out of my chair when I realized that for the contract "Rail Trail" I'd have to perform 6 trips, 2 with Medium logs and 4 with long logs!
The loading is also pretty messed up...
In auto-loading, the trailer is automatically filled, which is only 3 logs(in manual loading), which is feeling very weird for those who prefered the manual loading...
Why is there not something like 3 logs = half load, 6 logs full load?
The contract should consider the amount of logs... If you need 2-3 logs = half, 4-6 logs = full..
Optionnally, the 2nd type could be only available through manual loading.
This way, it would be more attracting to use the manual loading, as the additionnal work would allow us to perform only 1 trip for the contract, and potentially save lot of time.
We really need to have some adjustments on the value of the loads we transport, as it is now it feels we work for nothing and makes the contracts discouraging(too much work for the reward)...
And I must add the MASSIVE disapointment from the new trucks (W.S 5600 and Boar), which aren't even working properly...
Best regards.